 |
|
|
氧化鋁耐磨陶瓷管 |
.................................... |
|
氧化鋁耐磨陶瓷板 |
.................................... |
|
陶瓷管 |
.................................... |
|
耐磨陶瓷管 |
.................................... |
|
分料器 |
.................................... |
|
耐高溫陶瓷膠粘劑 |
.................................... |
|
可調節式膨脹節 |
.................................... |
|
下料彎頭 |
.................................... |
|
耐磨陶瓷閥 |
.................................... |
|
耐磨陶瓷片 |
.................................... |
|
耐磨陶瓷貼片管道 |
.................................... |
|
耐磨涂料 |
.................................... |
|
|
|
 |
|
地 址:宜興市宜城街道南園
電 話:0510-87458772
傳 真:0510-87458772
聯系人:蔣工 13961597233
蔣總 13961571887
郵 編:214225
網 址:www.google-analitic.com
郵 箱:sales@yxchenhong.com |
|
|
|
|
|
 |
|
下料彎頭 |
|
|
公稱通徑(Ф) |
法蘭孔中心(Dmm) |
法蘭外徑(Dmm) |
螺孔數量直徑(Dmm) |
下料出口直徑(Dmm) |
法蘭中心(Dmm) |
法蘭孔外徑(Dmm) |
螺孔數量 |
其他進出口尺寸 |
A |
B |
C |
D |
E |
80 |
200 |
235 |
8-18 |
300 |
445 |
485 |
12-23 |
320 |
530 |
420 |
477 |
225 |
100 |
225 |
260 |
8-18 |
300 |
445 |
485 |
12-23 |
320 |
530 |
420 |
477 |
225 |
150 |
280 |
315 |
8-18 |
300 |
445 |
485 |
12-23 |
375 |
530 |
420 |
425 |
250 |
200 |
335 |
370 |
12-18 |
300 |
445 |
485 |
12-23 |
375
|
530 |
420 |
552 |
250 |
|
|
(安裝說明)
瓷襯耐磨瓷管,結構形式如圖(1),是將工程耐磨陶瓷內襯于鋼殼以內,兩端法蘭和其它管道相連。所以安裝時請按下列要求操作:
1.嚴禁用錘子等金屬敲擊鋼殼,外表及兩端瓷面,以免損壞陶瓷。
2.瓷襯管和瓷襯管相連時,中間加3-5mm石棉墊,然后用螺栓均勻擰緊,如圖示(1)
3.瓷襯管和鋼管相連時,請先將非標法蘭套于鋼管上,加石棉墊片,并用螺栓固定法蘭,螺孔,然后點焊,非標法蘭和鋼管固定。再松開螺栓,將非標法蘭和鋼管焊牢,如圖(2) |
|
 |
|
|
The strucural form of the procelain-lined anti-wearing ceramic tipe is as Shown in fig(1).It is to put the anti-wearing ceramic inner spacer in the Case with its two ends joined to the other pipelines with a flange.
It should be installed according to the follow-ing operatins demands:
1.It is strictly not allowed to strike the steel case.the outer surface and the ceramies faces at the two ends with a hammer or other metallic articies to avoid damaging the ceramies.
2.When the two porcelain-lind pipes are going to be joined to gether,be sure to use an asbesto spacer (Attached with the product)of 3-5m to Beplaced between them.Then get ti tightened with a bolt as shown in fig.(1)
3.As the porceanin-lined pipe is Going to be joined to the steel pipe,please,first,get the nonstan-dard flance to be covered on the steel pipe with an asbestos spacer and let the flange and Screw fixed up with bolts.then.get Them to be spot-welded.Loosen the bolt as the nonstandard flange and steel pipe are both fixed up.then.get them welded tight.asshowninfIg, |
|
|
|